We were asked to survey this job to provide safe access for engineers to inspect this low level railway bridge. Working in conjunction with Highways, Network Rail & Traffic Management we came up with a plan to use out 4x4 Toyota MEWP. With a stowed height of 2.6m and set up width of 2.7m it was able to pass under the low bridge, set up and operate within the confines of the closed lane safely while traffic passed under traffic control.

Comments